FR Profile Editor: Layer 3 Emulator init
Switched virtual
connections
Implementation: One option must be selected from
the list of choices:-
Call reference length: 2, 3 or 4 octets long.
Wait for CONNECT ACK:-
No:
No waiting.
Yes:
Waiting for the incoming message.
Send CONNECT ACK: Message
transmitted if it is enabled.
Click on the message to edit the attached buffer of IEs.
No:
The message will not be sent.
Yes:
The message will be sent after incoming CONNECT.
Send DISC/RELEASE:
Message transmitted on timer expiry.
Click on the message to edit the attached buffer of IEs.
Timers: Value of time-limits specified for FR
Layer 3.
Permanent virtual connections
Use PVC management procedures: Optional.
Implementation of procedures for PVC using unnumbered information frames.
These procedures use periodic polling to determine the PVC status and
to verify the integrity of the link.
- Initial N(S): Initial number for the polling
sequence.
Use
T1.617 Annex D
No:
Use of Q933 Annex A.
Yes:
Use of T1.617 Annex D.
Bidirectional procedures: Optional.
Polling procedures are initiated by both user and network sides.
- Initial N(S): Initial number for the supplementary
polling sequence.
Use of single PVC async. status messages: Optional.
Status messages are dedicated to one PVC at the same time in asynchronous
mode.
System parameters: Value of counters to be specified
for PVC management procedures of FR Layer 3.
Timers: Value of time-limits to be specified
for PVC management procedures of FR Layer 3.
Number of PVC: The PVCs can be used in generator
behaviour.
List of PVC(s): The list can be composed of one
or several lines displaying the PVC characteristics.
The current PVC is highlighted in the list:-
- PVC: PVC identification number.
- DLCI: Related DLCI value.
Edit...: Allows
you yo edit the current PVC's DLCI value.
|